Why Data Centers Need an ALTA Title Survey First

Aerial view of construction site showing trucks and heavy equipment preparing land development that requires an alta title survey

Kansas City is in the middle of a digital building boom. Just last month, Port KC approved billions in private funding for new data centers, and companies like DataBank have already started expanding their footprint in the metro. These massive projects power the internet, cloud storage, and the apps we use every day. Yet before a shovel hits the dirt, each development begins with the same step: an ALTA title survey.

This survey might not grab headlines like new jobs or shiny server halls, but it is the backbone of every project. Without it, investors hesitate, lenders hold back funds, and construction teams face delays. 

Why Developers Can’t Skip an ALTA Title Survey

A data center is not a small project. It needs acres of land, direct access to power, and clear routes for fiber optic cables. Developers also have to coordinate with multiple stakeholders—city officials, utility companies, and private investors. That’s a lot of moving parts.

The ALTA title survey gives everyone the same map. It shows exact property boundaries, all easements, and any restrictions that could block construction. In short, it confirms the land is ready for development. Without this clarity, projects risk legal disputes or costly redesigns down the road.

In Kansas City, where projects move quickly to capture market demand, skipping this step could stall progress for months.

The Kansas City Data Center Rush

So why is this important right now? Because Kansas City is becoming a prime hub for data infrastructure. Port KC recently gave the green light for up to $100 billion in private funding for digital projects. That includes new sites on both the Missouri and Kansas sides of the metro.

With that much investment, accuracy matters more than ever. A missed easement or overlooked utility line could mean millions lost. An ALTA title survey makes sure the groundwork is solid, literally and legally. It is the confidence check investors demand before they write the check.

What ALTA Surveys Cover That Standard Surveys Miss

At first glance, an ALTA title survey looks like a detailed map. But it does much more. It includes items that are critical for big infrastructure projects:

  • Utility corridors: Underground and overhead lines, substations, and power easements.
  • Access rights: Roads for heavy trucks and service vehicles, clearly mapped and legally documented.
  • Fiber routes: Easements for high-speed data connections that must be secure and uninterrupted.
  • Encumbrances: Restrictions or overlaps, such as old plats or cemeteries, that may limit site use.

For a data center, every one of these details matters. If a cooling tower needs more space, or a fiber line crosses private land without permission, the project could face expensive setbacks.

The Table A Details That Keep Projects on Track

Licensed land surveyor using a total station to document utilities and access points for an alta title survey

Every ALTA title survey can include optional “Table A” items. For data centers, several of these are especially useful:

  • Item 11: Shows the location of underground utilities. Data centers can’t risk surprises when digging for cables or foundations.
  • Item 16: Confirms if road access has changed or if right-of-way is in dispute. Delivery trucks and emergency crews depend on clear routes.
  • Item 8: Identifies cemeteries or burial grounds. It may sound rare, but one undiscovered site can halt construction completely.

These details might feel technical, but they prevent million-dollar mistakes. Developers know the cost of delay is higher than the cost of doing the survey right the first time.

Cooling, Water, and Floodplain Checks

Another reason the ALTA title survey is vital: water. Data centers use huge amounts of energy, and many rely on cooling systems tied to local water sources. Kansas City’s mix of rivers, streams, and flood-prone areas makes hydrology a concern for every project.

The survey verifies floodplain lines, setbacks, and drainage paths. It also maps out easements connected to stormwater or water utility lines. This information keeps cooling systems safe and compliant with local regulations. For developers, it’s peace of mind that a future storm won’t wash away their investment.

Why Timing Matters More Than Ever

Port KC is moving projects fast, and competition between developers is fierce. The earlier a survey is ordered, the sooner financing clears and construction begins. Waiting until the last minute invites delays when lenders, attorneys, or title companies demand revisions.

Think of the ALTA title survey as the green light. It signals to every stakeholder—investors, city planners, engineers—that the land is ready. With Kansas City’s timeline, starting this process early is the only way to stay competitive.

The Big Takeaway for Developers and Investors

Kansas City is on the rise as a national data hub. But behind every data center is a careful process, and the ALTA title survey is at its heart. It is not just paperwork. It is risk control, compliance assurance, and the foundation of trust between developers and financiers.

For investors, it means confidence in their capital. For engineers, it means fewer surprises on site. And for the city, it means projects that are ready to serve the community without delays.

Closing Thoughts

Every headline about Kansas City’s digital future starts the same way—with land. And every piece of land needs proof. That proof comes from an ALTA title survey.

If you’re planning a project, make sure the survey is first on your list. It’s the difference between a smooth launch and a stalled build.

author avatar
Surveyor

More Posts

Aerial view of wetlands captured through drone surveying to show water patterns and elevation changes
land surveying
Surveyor

Drone Surveying Solves Hidden Wetland Mapping Challenges

When you think about drone surveying, you might picture maps, big construction sites, or new housing projects. But this week, researchers at the University of Missouri showed something surprising — drones can count ducks. Their new study used artificial intelligence (AI) to track thousands of waterfowl across Missouri wetlands. That

Read More »
Licensed land surveyor using a total station at an urban construction site to ensure precise building alignment
land surveyor
Surveyor

How a Licensed Land Surveyor Prevents Construction Chaos

Kansas City is celebrating again. The Main Street Streetcar Extension, which opened on October 24, 2025, now runs all the way from downtown to UMKC. With eight new stops and bright red transit-only lanes, Main Street looks completely different. But behind the smooth new ride stands an unsung professional who

Read More »
Two land surveyors using a total station on a construction site representing boundary survey delays in real estate
boundary surveying
Surveyor

Boundary Survey Delays Are Killing Real Estate Deals

If you’ve ever waited weeks for your home closing and felt like the surveyor disappeared, you’re not alone. Many buyers, sellers, and real estate agents are asking the same question: “What’s taking so long with the boundary survey?” A boundary survey might sound like a small step, but it can

Read More »
Land surveyor using a total station during an elevation survey to record precise land measurements for documentation
flood damage
Surveyor

Why Every Elevation Survey Should Be Documented

If you’ve ever had a fence, driveway, or flood insurance claim turn into a neighborhood argument, you know how fast things can escalate. That’s where an elevation survey becomes more than a technical report—it’s your best legal protection. In St. Louis, homeowners and builders often order elevation surveys for flood

Read More »
Aerial view of construction site showing trucks and heavy equipment preparing land development that requires an alta title survey
alta survey
Surveyor

Why Data Centers Need an ALTA Title Survey First

Kansas City is in the middle of a digital building boom. Just last month, Port KC approved billions in private funding for new data centers, and companies like DataBank have already started expanding their footprint in the metro. These massive projects power the internet, cloud storage, and the apps we

Read More »
Land surveyor using a total station and reviewing records for an ALTA Land Title Survey
alta survey
Surveyor

ALTA Land Title Survey Prep: MSD & County Records

When you order an ALTA Land Title Survey, you expect clear results that lenders, attorneys, and title companies can trust. Yet many surveys take longer than they should. The delays often come from missing local data—like sewer easements, parcel boundaries, or recording requirements. The good news? With the right prep,

Read More »